Ward Renovation Solutions
← Dashboard

Armand Sordi

Floor System Upgrade & Sliding Door Replacement

455-56 Meadowview Dr · Aurora, OH 44202

$12,800

Customer total

$5,120

40% deposit

Proposal
Scope
  • 1. Demolition & Preparation
    • Remove existing carpet and padding throughout the 20' × 20' area (~400 SF)
    • Remove tack strips, fasteners, and debris
    • Dispose of all materials off-site
    • Prepare subfloor for new installation
  • 2. Floor System Installation
    • Install pressure-treated wood sleeper system across entire floor area
    • Level and shim system to create a consistent, even floor height
    • Install rigid foam insulation between sleepers
    • Double-layer subfloor: 3/4" T&G plywood + 1/2" plywood, staggered & secured
  • 3. Sliding Door Replacement
    • Remove and dispose of existing sliding glass door
    • Install new 60" vinyl sliding glass door (Pella 150 Series or equivalent)
    • Install proper flashing, insulation, and sealing
    • Adjust and test door for smooth operation
  • 4. Exterior Brick Work
    • Install one course of brick below new sliding door
    • Match existing exterior brick and mortar
    • Ensure proper integration with door threshold and drainage
  • 5. Final Cleanup
    • Remove all debris and construction materials
    • Final walkthrough to ensure quality and satisfaction
Notes
  • ·Estimated Duration: 4–6 working days
  • ·Includes all labor and materials unless otherwise noted
  • ·Payment accepted via Venmo: Yoshi Nakamura @YENaka
Assumptions
  • ·Existing subfloor structurally sound below carpet
  • ·Door rough opening within tolerance for Pella 150
Exclusions
  • Finish flooring not included
  • Permits, if required, are not included
Activity
  1. 2026-04-08 09:12arloweImported source PDF and extracted scope
  2. 2026-04-08 09:12arloweCustomer, property, total, deposit captured
  3. 2026-04-08 10:40Ryan WardConfirmed deposit at 40% — approved v1